New Construction

Feature Project






Job Name: Morinville Leisure Centre
Contractor: Clark Builders
Description: New construction of a 95,000 sqft multi-use leisure centre. There is a full sized rink, a running track and field house, as well as a fitness centre and full concession.
Job Name: Government Grounds
Contractor: EllisDon
Description: Complete demolition, ground work, and new construction of the legislature grounds public wading pools and fountains. This build consisted of strict life safety grounding & bonding of the pool areas to ensure the public stays safe as well as beautiful artistic lighting features to help the heart of Edmonton shine.
Job Name: Centennial Plaza Park Revitalization
Contractor: Clark Builders
Description: Park revitalization in heart of Edmonton. This project included the installation of custom light fixtures in several pieces of art, working in custom perforated paneling, protection of the nearby tree’s and plants, and complete coordination with the city of Edmonton to ensure a thoughtful design. This park is surely going to be a hotspot for events during the summer time in the near future!
Job Name: Lakeland College
Contractor: Chandos Construction
Description: College addition in Vermillion AB. Lakeland college continues its mission of academic excellence and growth with a building upgrade to accommodate societies requirements for new classroom spaces.
Job Name: Athabasca Pool & Fitness Centre
Contractor: Clark Builders
Description: Construction of a new indoor pool and fitness centre added onto the existing Athabasca Multiplex. This project was bid and ran as a design assist project with Clark Builders and SMP Engineering.
Job Name: Windermere Car Wash, Bottle Depot & Registry
Contractor: Carlson Construction
Description: This ground-up development included the site services as well as construction of a new bottle depot, multi-bay carwash and a registry office. All three buildings as well as the site services were completed simultaneously.
Job Name: Windermere Firehall
Contractor: PCL Construction
Description: Brand new fire station for the City of Edmonton. This building has been constructed to follow strict Net Zero standards as well as providing a safe space for disaster relief and protection. Some building systems include a fully covered solar panel roof, emergency generator power, lightning protection, and full site services.
Job Name: Forbes Brothers Office
Contractor: Clark Builders
Description: New two storey office building with a heated underground parkade on the south side of Edmonton. There are new site services, site lighting and a back-up generator on the roof as well.
Job Name: Barrhead Aquatic Centre
Contractor: Clark Builders
Description: New multi-pool aquatic centre that was added onto the existing curling agrena in Barrhead. The new building was also equipped with solar panels and inverters.
Job Name: North Point Church
Contractor: Keller Construction
Description: Expansion of an existing church on the north side of Edmonton. The new section of the building included a new multi-purpose room as well as new classrooms, and renovations to some of the existing church.
Job Name: St. Albert Firehall
Contractor: PCL Construction
Description: Brand new fire station for the city of St. Albert. The electrical infrastructure of the new fire hall in St. Albert has been meticulously engineered to not only meet the stringent operational demands of firefighting but also to embody the city's commitment to sustainability and resilience. With a focus on reliability, efficiency, and safety, this system integrates cutting-edge technologies and best practices to ensure seamless functionality and optimal performance in all conditions.
Job Name: Jensen Lakes Landmark Theatre
Contractor: Clark Builders
Description: Wiring of a 40,000 square foot movie theatre with eight luxury auditoriums and a full service concession, each auditorium is complete with fully functioning reclining seats.
Job Name: U Store It - St. Albert
Contractor: Fillmore Construction
Description: A new five storey storage facility on the north end of St. Albert, including a complete PTI system integrated with store-logix for over nine hundred storage units. The main floor also has capabilities for future subleases.
Job Name: Sherwood Park Volkswagen
Contractor: Carlson Construction
Description: A new 70,000 square foot ground-up two storey Volkswagen car dealership in Sherwood Park, with a heated underground parkade and a complete mechanics service shop.
Job Name: Town Square
Contractor: Keller Construction
Description: Multi-level CRU in Terwillegar, located near the Terwillegar Recreational centre
Job Name: U Store It - Ellerslie
Contractor: Millenium Construction
Description:
Job Name: Ellwood Medical
Contractor: Keller Construction
Description: Multi-level medical facility in Ellerslie, with easy access off of the Anthony Henday and just minutes away from South Edmonton Common.
Job Name: Elk Point RCMP
Contractor: Kenlar Insulations
Description: Construction of a new RCMP detachment in Elk Point Alberta. The building also included a detention facility and an intricate security system.
Job Name: Sherwood Ford Detail Facility
Contractor: Carlson Construction
Description: New construction of a 15,000 square foot, two storey Ford detail centre in Sherwood Park.